July 9, 2014
Progress continues on the Bjarke Ingels Group’s Miami project, Grove at Grand Bay. The north tower’s floor slabs have been poured up to the fifth floor, while the core has reached the seventh, while the south tower’s slabs have reached the fourth floor, and the core the sixth.
Check out the construction progress on our Miami project:
http://miami.curbed.com/archives/2014/07/03/grove-at-grand-bay-construction-photos.php