DeSimone provided 3D structural modeling and detailing for the steel portions of the building in order to generate fabrication shop drawings, material lists, and CNC files for the steel fabricator
School was broken into 4 areas with the pool area being the most challenging due to the architectural exposed trusses
Level of finish required to satisfy the architect was very comprehensive and required a high level of communication
Mock-up joints were required to achieve the desired final product