BMC Durfee High SchoolFall River, Massachusetts

  • DeSimone provided 3D structural modeling and detailing for the steel portions of the building in order to generate fabrication shop drawings, material lists, and CNC files for the steel fabricator
  • School was broken into 4 areas with the pool area being the most challenging due to the architectural exposed trusses
  • Level of finish required to satisfy the architect was very comprehensive and required a high level of communication
  • Mock-up joints were required to achieve the desired final product
  • The total tonnage for this project was 2,900 tons