DeSimone performed Preconstruction services alongside outside structural Engineers to pre-detail this very complicated Disney theme park structure. A design-build project extending several years, DeSimone was instrumental in creating the preconstruction and fabrication ready models for full shop production and steel erection
This 10,000 ton project featured complex connections requiring continual refinement of plate and fixture techniques to accurately assemble the complex vine structure used to support the floating mountains
Factoring in structural consideration for erection was an important aspect of DeSimone’s scope of work
Integration of point-cloud data throughout the project ensured the fabrication model was built to the precise tolerances