- Located adjacent to the Jockey Club and squeezed between the Bellagio and MGM CityCenter site
- A 6.5 million sf project on a limited seven-acre site
- The limited site area forced a non-conventional vertically stacked solution
- Parking for 3,000 cars was pushed below grade
- Slurry walls are utilized, which facilitated the depth of excavation at 75 feet