XXI Forever (Two Stockton)San Francisco, California

  • Includes the seismic upgrade for the un-reinforced four-story masonry retail building
  • Design includes implementing shotcrete walls and frames and placing new concrete floor diaphragms over the existing wood floors
  • Existing columns and walls are removed from tenant spaces to maximize the usable floor plates
  • The building’s current main tenant is XXI Forever